Space Planning

Past Projects

Tarleton State University - Blaze Pizza

Location: 1333 W. Washington St Stephenville, TX 76401
Start Date: May 2022
Completion Date: August 2022
Superintendent: Bob Foster
Project Manager: Ty Barr
Client Reference: David Muise, Construction Director
David.muise@sscserv.com (214) 458‐0357
Services Provided: Renovation of convenient store into Blaze Pizza which included Framing, Painting,
Mechanical, Electrical, Plumbing, Concrete, Metal Work and Store Front work.

Dallas College - El Centro Fire Protection Upgrade

Location: 801 main St. Dallas, TX 75202
Start Date: June 2022
Completion Date: On‐Going
Superintendent: Phillip Robinson
Project Manager: Thom Letwinch
Client Reference: Oscar Bustos, Construction manager
obustos@dcccd.edu (214) 860‐2389
Services Provided: Upgraded fire protection services inside of the Bill J. Priest Building.

Tarleton State University – Child Development Center Upgrade

Location: 1333 W. Washington St Stephenville, TX 76401
Start Date: October 2021
Completion Date: April 2022
Superintendent: Ty Barr
Project Manager: Ty Barr
Client Reference: Roger Smith, SSC Construction manager
Rsmith49@hotmail.com (512) 422‐8933
Services Provided: Complete renovation of a two‐story building that transformed into a child development center.
Services included Framing, Mechanical, Electrical, Audio Visual, Plumbing, Concrete, Steel Work, Flooring, Painting,
and Exterior Overhead Protection.

Tarleton State University - Dining Hall Sunshade

Location: 1333 W. Washington St Stephenville, TX 76401
Start Date: April 2022
Completion Date: August 2022
Superintendent: Darren Worlow
Project Manager: Ty Barr
Client Reference: Roger Smith, SSC Project Manager
Rsmith49@hotmail.com (512) 422‐8933
Services Provided: Installation of exterior sunshade canopy which included concrete, electrical, and acoustical coordination for speakers.

Tarleton State University - Moody Hall IFC

Location: 1333 W. Washington St Stephenville, TX 76401
Start Date: May 2022
Completion Date: June 2022
Superintendent: David Fluegga
Project Manager: Thom Letwinch
Client Reference: Roger Smith, SSC Project Manager
Rsmith49@hotmail.com (512) 422‐8933
Services Provided: Provided new asphalt paving for existing parking lot and adding new curbs around the
perimeter.

Ft. Hood Fencing Project

Location: 761st Tank Battalion Ave Killeen, TX
Start Date: October 2020
Completion Date: September 2021
Superintendent: Heather Hamilton
Project Manager: Tod McAllister
Client Reference: Andres Garcia
andres.j.garcia.civ@mail.mil (254) 553‐9320
Services Provided: Fencing repairs across the entire base at Fort Hood.

Tarleton State University – Banquet Hall Painting

Location: 1333 W. Washington St Stephenville, TX 76401
Start Date: April 2022
Completion Date: April 2022
Superintendent: David Fluegga
Project Manager: Ty Barr
Client Reference: Roger Smith, SSC Project Manager
Rsmith49@hotmail.com (512) 422‐8933
Services Provided: Painted entire banquet hall at Tarleton State University.

Dallas College – Coppell Center Scrubber Equipment Relocation

Location: 101 S Royal Ln, Coppell, TX 75019
Start Date: January 2022
Completion Date: July 2022
Superintendent: Dustin Apilando
Project Manager: Shance Jackson
Client Reference: Chris Marrs, Construction Manager
cmarrs@dcccd.edu (817) 304‐0582
Services Provided: Relocated an interior scrubber outside on to a concrete pad and reconnected mechanical and
electrical to the scrubber. A 15 foot masonry wall was constructed around the perimeter of the scrubber to
conceal it from students.

TxDot Wichita Falls - Flooring Replacement

Location: 900 Central E Fwy, Wichita Falls, TX 76306
Start Date: April 2023
Completion Date: April 2023
Superintendent: Zach Weimer
Project Manager: Ty Barr
Client Reference: Claire Spivey, Supervisor
Claire.Spivey@txdot.gov (940) 723‐7931
Services Provided: Replaced floor in Wichita Falls TxDot.

TxDot Wichita Falls - Asphalt Replacement

Location: 900 Central E Fwy, Wichita Falls, TX 76306
Start Date: June 2023
Completion Date: June 2023
Superintendent: Landry Sampson
Project Manager: Ty Barr
Client Reference: Claire Spivey, Supervisor
Claire.Spivey@txdot.gov (940) 723‐7931
Services Provided: Replaced existing asphalt parking lot at Wichita Falls TxDot.

TSTC Red Oak Campus - Interior Light Retrofit

Location: 900 Central E Fwy, Wichita Falls, TX 76306
Start Date: July 2023
Completion Date: August 2023
Superintendent: Austin Wade
Project Manager: Ty Barr
Client Reference: Thomas Betik, Facilities Manager
trbetik@tstc.edu (469) 802-6823
Services Provided: Retrofitted Interior Lights

Barksdale B-52 Tail Fin

Location: Barksdale Air Force Base, Shreveport La
Start Date: September 2023
Completion Date: November 2023
Superintendent: Omar Hassan

Project Manager: Ty Barr
Client Reference: Christopher Mitchell
Christopher.Mitchell.36@us.af.mil (318) 456-6739
Services Provided: Restoration of tailfin monument.

TSTC Red Oak Campus - Conference Room TV Installation

Location: 900 Central E Fwy, Wichita Falls, TX 76306
Start Date: March 2024
Completion Date: March 2024
Superintendent: Austin Wade
Project Manager: Ty Barr
Client Reference: Thomas Betik, Facilities Manager
trbetik@tstc.edu (469) 802-6823
Services Provided: Removed projectors and installed two 85" TV's.

JPS Bardin Rd Clinic Remediation

Location: 1741 E. Bardin Rd. Arlington, TX 76018
Start Date: November 2023
Completion Date: January 2024
Superintendent: Landry Sampson
Project Manager: Ty Barr
Client Reference: Juan Morado
Jmorado@jpshealth.org (817) 702-4994
Services Provided: Removed three cedar elms, installed new sod, added a parking lot drain, removed and repoured the exterior stairway and sidewalk, and installed 9 new cedar elms around the property.